Finally, an array of controls need to be added to the building to guarantee accurate working. The following list is some examples, however, this will be depended on the project.
-
Boiler control (constant, weather profile)
-
Control of 3-way valves and other mixing circuits
-
Controls over the headers
-
Pump controls
-
Vacation periods